All in a Day's Work... Submitted by: Phil

To contact us Click HERE
  SATURDAY: 1/12/13                   4 Degrees    Clear I left for the equipment yard at 5:10 am to start the 772D and 644K.  Dave L. arrived at 7:30.  Fully inspected the 772D grader.   At 8:02 he began plowing from Forbes Park Road to McNaughton using the snow wing only.  From McNaughton, he drove to Soubry.  He spent 2-1/2 hrs clearing drifts on Soubry.  He left Soubry, went down Wagon Mesa Loop to Forbes Park Road.  Dave then started clearing drifts all the way up to and including Forbes Park Loop.  From there he went up to Petito and Vent.  He finally returned to the equipment yard about 6:00pm.  